Installing Puppet Enterprise
Set up Puppet Enterprise in four easy steps
Let’s walk through each of the steps below to get running ASAP. Get more details from our documentation.
Step 1: Download Puppet Enterprise binary for your platform
Scroll down to view a full list of all Puppet Enterprise 2026.0.1 primary servers. Previous Puppet Enterprise versions are also available for download.
Step 2: Check the system requirements
Refer to these system requirements for Puppet Enterprise installations.
- Hardware requirements: these hardware requirements are based on internal testing.
- Supported operating systems: Puppet Enterprise supports various operating systems depending on the role a machine assumes in your infrastructure.
- Supported browsers: the following browsers are supported for use with the console.
- System configuration: before installing Puppet Enterprise, make sure that your nodes and network are properly configured.
Step 3: Read our installation + configuration guide
Consider this your quick start guide to Puppet Enterprise. Use it to install Puppet Enterprise, add your content, and start configuring your infrastructure.
Step 4: Get additional help
Upgrading Puppet Enterprise? Get detailed instructions for upgrading to the latest version.
Tip: To download the installer directly to the node that will be your primary server, you can use these commands:
wget --content-disposition 'URL'curl -JLO 'URL'Need to license more than 10 nodes? Visit our Pricing page to build the perfect plan for your organization.
Puppet Enterprise 2026.0.1 Primary Servers
| OS | Architecture | Links |
|---|---|---|
| Amazon Linux 2023 | x86_64 | Download | GPG signature |
| EL (Alma Linux, Oracle Linux, RHEL, Rocky Linux) 8 | x86_64 | Download | GPG signature |
| EL (Alma Linux, RHEL, Rocky Linux) 9 | x86_64 | Download | GPG signature |
| EL (RHEL) 10 | x86_64 | Download | GPG signature |
| RHEL 8 with Federal Information Processing Standards (FIPS) | x86_64 | Download | GPG signature |
| SLES 15 | x86_64 | Download | GPG signature |
| Ubuntu 22.04 | amd64 | Download | GPG signature |
| Ubuntu 24.04 | amd64 | Download | GPG signature |
| Ubuntu 26.04 | amd64 | Download | GPG signature |
Puppet Enterprise 2026.0.1 Agents
Credentials are needed to download these packages. The username must be the literal string 'license-id'. The password is contained in the PE license.
| OS | Architecture | Links |
|---|---|---|
| AIX 7.2 | ppc | Download |
| AIX 7.3 | ppc | Download |
| Amazon 2023 | x86_64 | Download |
| Amazon 2023 | aarch64 | Download |
| Amazon 2023 with Federal Information Processing Standards (FIPS) | x86_64 | Download |
| Debian 11 | amd64 | Download |
| Debian 11 | arm64 | Download |
| Debian 12 | amd64 | Download |
| Debian 12 | arm64 | Download |
| Debian 13 | amd64 | Download |
| Debian 13 | arm64 | Download |
| EL (Alma Linux, Oracle Linux, RHEL, Rocky Linux) 8 | x86_64 | Download |
| EL (Alma Linux, Oracle Linux, RHEL, Rocky Linux) 8 | aarch64 | Download |
| EL (Alma Linux, Oracle Linux, RHEL, Rocky Linux) 8 | ppc64le | Download |
| EL (Alma Linux, Oracle Linux, RHEL, Rocky Linux) 9 | x86_64 | Download |
| EL (Alma Linux, Oracle Linux, RHEL, Rocky Linux) 9 | aarch64 | Download |
| EL (Alma Linux, Oracle Linux, RHEL, Rocky Linux) 9 | ppc64le | Download |
| EL (Alma Linux, Oracle Linux, RHEL, Rocky Linux) 10 | x86_64 | Download |
| EL (Alma Linux, RHEL, Rocky Linux) 10 | aarch64 | Download |
| RHEL 8 with Federal Information Processing Standards (FIPS) | x86_64 | Download |
| RHEL 9 with Federal Information Processing Standards (FIPS) | x86_64 | Download |
| Fedora 41 | x86_64 | Download |
| OS X 14 (Sonoma) | x86_64 | Download |
| OS X 14 (Sonoma) | arm64 | Download |
| OS X 15 (Sequoia) | arm64 | Download |
| OS X 26 (Tahoe) | x86_64 | Download |
| OS X 26 (Tahoe) | arm64 | Download |
| SLES 12 | x86_64 | Download |
| SLES 15 | x86_64 | Download |
| Solaris 11 | i386 | Download | GPG signature |
| Solaris 11 | sparc | Download | GPG signature |
| Ubuntu 22.04 | amd64 | Download |
| Ubuntu 22.04 | arm64 | Download |
| Ubuntu 24.04 | amd64 | Download |
| Ubuntu 24.04 | arm64 | Download |
| Ubuntu 26.04 | amd64 | Download |
| Ubuntu 26.04 | arm64 | Download |
| Microsoft Windows (Windows Server 2012/2016/2019/2022/2025, Windows 8/10/11) | x64 | Download |
| Windows with Federal Information Processing Standards (FIPS) | x64 | Download |